GENERAL ASSEMBLY OF NORTH CAROLINA
SESSION 2015
H 2
HOUSE BILL 795
Committee Substitute Favorable 4/23/15
Short Title: SEPA Reform. |
(Public) |
|
Sponsors: |
|
|
Referred to: |
|
|
April 15, 2015
A BILL TO BE ENTITLED
AN ACT to reform and amend the State environmental policy act.
The General Assembly of North Carolina enacts:
SECTION 1. G.S. 113A‑4 reads as rewritten:
"§ 113A‑4. Cooperation of agencies; reports; availability of information.
The General Assembly authorizes and directs that, to the fullest extent possible:
…
(2) Every State agency shall include in every recommendation or report on any action involving significant expenditure of public moneys or use of public land for projects and programs significantly affecting the quality of the environment of this State, a detailed statement by the responsible official setting forth the following:
a. The direct environmental impact of the proposed action;
b. Any significant adverse environmental effects which cannot be avoided should the proposal be implemented;
c. Mitigation measures proposed to minimize the impact;
d. Alternatives to the proposed action;
e. The relationship between the short‑term uses of the environment involved in the proposed action and the maintenance and enhancement of long‑term productivity; and
f. Any irreversible and irretrievable environmental changes which would be involved in the proposed action should it be implemented.
For purposes of this subdivision, a direct environmental impact does not include impacts that are speculative, secondary, or cumulative with other previous actions or that occur outside of the State.
(2a) Prior to making any detailed statement, the responsible official shall consult with and obtain the comments of any agency which has either jurisdiction by law or special expertise with respect to any environmental impact involved. The failure of an agency to provide comments within the comment period established under this subdivision or to request an extension for a specific period of time set forth in the request shall be treated by the responsible official as a conclusion by that agency that there is no significant environmental impact. Any unit of local government or other interested party that may be adversely affected by the proposed action may submit written comment. The responsible official shall consider written comment from units of local government and interested parties that is received within the established comment period. Copies of such detailed statement and such comments shall be made available to the Governor, to such agency or agencies as he may designate, and to the appropriate multi‑county regional agency as certified by the Secretary of Administration, shall be placed in the public file of the agency and shall accompany the proposal through the existing agency review processes. A copy of such detailed statement shall be made available to the public and to counties, municipalities, institutions and individuals, upon request.
…."
SECTION 2. G.S. 113A‑9 reads as rewritten:
"§ 113A‑9. Definitions.
As used in this Article, unless the context indicates otherwise, the term:
…
(7) "Public land" means all land and
interests therein, title of which is vested in the State of North Carolina, in
any State agency, or in the State for the use of any State agency or political
subdivision of the State, and includes all vacant and unappropriated land,
swampland, submerged land, land acquired by the State by virtue of being sold
for taxes, escheated land, and acquired land.taxes or by any other
manner of acquisition, or escheated land.
(7a) "Significant expenditure of public moneys" means expenditures of public funds greater than twenty million dollars ($20,000,000) for a single project or action or related group of projects or actions. For purposes of this subdivision, contributions of funds or in‑kind contributions by municipalities, counties, regional or special‑purpose government agencies, and other similar entities created by an act of the General Assembly and in‑kind contributions by a non‑State entity shall not be considered an expenditure of public funds for purposes of calculating whether such an expenditure is significant.
…
(11) "Use of public land" means land‑disturbing activity of greater than 20 acres that results in substantial, permanent changes in the natural cover or topography of those lands that includes:
a. The grant of a lease, easement, or permit authorizing private use of public land; or
b. The use of privately owned land for any project or
program if (i) the State or any agency of the State has agreed to
purchase the property or to exchange the property for public land.land
and (ii) the use meets the other requirements of this subdivision."
SECTION 3. G.S. 113A‑10 reads as rewritten:
"§ 113A‑10. Provisions supplemental.
The policies, obligations and provisions of this Article are
supplementary to those set forth in existing authorizations of and statutory
provisions applicable to State agencies and local governments. In those
instances where a State agency is required to prepare an environmental document
or to comment on an environmental document under provisions of federal law, no
separate environmental document shall be required to be prepared or published
under this Article so long as the environmental document or comment shall
meetmeets the provisions of this Article."
SECTION 4. G.S. 113A‑11 reads as rewritten:
"§ 113A‑11. Adoption of rules.
(a) The Department of Administration shall adopt rules to implement this Article.
(b) Each State agency may shall adopt
rules that establish minimum criteria. An agency may include a particular
action or class of actions in its minimum criteria only if the agency makes a
specific finding that the action or class of actions has no significant long‑term
impact on the environment. Rules establishing minimum criteria shall be
consistent with rules adopted by the Department of Administration. In
addition to all other rule‑making requirements, rules establishing
minimum criteria are subject to approval by the Secretary of Administration."
SECTION 5. G.S. 113A‑12 reads as rewritten:
"§ 113A‑12. Environmental document not required in certain cases.
No Notwithstanding any other provision in this
Article, no environmental document shall be required in connection with:
(1) The construction, maintenance, or removal of an
electric power line, water line, sewage line, stormwater drainage line,
telephone line, telegraph line, cable television line, data transmission line, or
natural gas lineline, or similar infrastructure project within
or across the right‑of‑way of any street or highway.
(2) An action approved under under:
a. Aa general permit issued under
G.S. 113A‑118.1, 143‑215.1(b)(3), or 143‑215.108(c)(8).
b. A Coastal Habitat Protection Plan under G.S. 143B‑279.8.
c. A special order pursuant to G.S. 143‑215.2 or G.S. 143‑215.110.
d. An action taken to address an emergency under G.S. 143‑215.3 or other similar emergency conditions.
e. A remedial or similar action to address contamination under Chapter 130A or 143 of the General Statutes, including a brownfield agreement entered into under G.S. 130A‑310.32.
f. A certificate of convenience and necessity under G.S. 62‑110.
g. An industrial or pollution control project approval by the Secretary of Commerce under Chapter 159C of the General Statutes.
h. A project approved as a water infrastructure project under Chapter 159G of the General Statutes.
i. A certification issued by the Division of Water Resources of the Department of Environment and Natural Resources under the authority granted to the Environmental Management Commission by G.S. 143B‑282(a)(1)u.
(3) A lease or easement granted by a State agency for:
a. The use of an existing building or facility.
b. Placement of a wastewater line or other structures or uses on or under submerged lands pursuant to a permit granted under G.S. 143‑215.1.
c. A shellfish cultivation lease granted under G.S. 113‑202.
d. A facility for the use or benefit of The University of North Carolina System, the North Carolina community college system, the North Carolina public school systems, or one or more constituent institutions of any of those systems.
e. A health care facility financed pursuant to Chapter 131A of the General Statutes or receiving a certificate of need under Article 9 of Chapter 131E of the General Statutes.
(4) The construction of a driveway connection to a public roadway.
(5) A Any State action in connection with a project
for which public lands are used and/or public monies are expended if the
land or expenditure is solely for the payment of incentives provided
as an incentive for the project pursuant to an agreement that makes the incentive
paymentsincentives contingent on prior completion of the project or
activity, or completion on a specified timetable, and a specified level of job
creation or new capital investment.
(6) A major development as defined in G.S. 113A‑118 that receives a permit issued under Article 7 of Chapter 113A of the General Statutes.
…
(9) Facilities created in the course of facilitating closure activities under Part 2I of Article 9 of Chapter 130A of the General Statutes.
(10) Any project or facility specifically required or authorized by an act of the General Assembly.
(11) Any project undertaken as mitigation for the impacts of an approved project or to mitigate or avoid harm from natural environmental change, including wetlands and buffer mitigation projects and banks, coastal protections and mitigation projects, and noise mitigation projects."
SECTION 6. G.S. 159G‑38 reads as rewritten:
"§
159G‑38. Environmental assessment and publicPublic
hearing.
(a) Required Information. – An application
submitted under this Article for a loan or grant for a project must state
whether the project requires an environmental assessment. If the application indicates
that an environmental assessment is not required, it must identify the
exclusion in the North Carolina Environmental Policy Act, Article 1 of Chapter
113A of the General Statutes, that applies to the project. If the application
does not identify an exclusion in the North Carolina Environmental Policy Act,
it must include an environmental assessment of the project's probable impacts
on the environment.
(b) Division Review. – If, after reviewing
an application, the Division of Water Infrastructure determines that a project
requires an environmental assessment, the assessment must be submitted before
the Division continues its review of the application. If, after reviewing an
environmental assessment, the Division concludes that an environmental impact
statement is required, the Division may not continue its review of the
application until a final environmental impact statement has been completed and
approved as provided in the North Carolina Environmental Policy Act.
(c) Hearing. – The Division of Water
Infrastructure may hold a public hearing on an application for a loan or grant
under this Article if it determines that holding a hearing will serve the
public interest. An individual who is a resident of any county in which a
proposed project is located may submit a written request for a public hearing.
The request must set forth each objection to the proposed project or other
reason for requesting a hearing and must include the name and address of the
individual making the request. The Division may consider all written objections
to the proposed project, any statement submitted with the hearing request, and
any significant adverse effects the proposed project may have on the
environment. The Division's decision on whether to hold a hearing is conclusive.
The Division must keep all written requests for a hearing on an application as
part of the records pertaining to the application."
SECTION 7. This act is effective when it becomes law and applies to State agency action occurring on or after that date.